06/07/2019 the first launch of the PТ-35-2,9/0,8/0,12 turbine was performed after the repair and replacement of the electronic part of the Turbine Control-35MW at PJSC “Zaporozhstal”
Jul 8, 2019At PJSC “Zaporozhstal” on July 6, 2019, the first launch of the PТ-35-2,9/0,8/0,12 turbine was performed after the repair and replacement of […]